The estimated time of arrival in the required position in the GSO (49 degrees E) is expected to be completed by the end of June 2019.
ConnectechAsia2019
The vehicle has a length of 20.8 meters and a liftoff mass of 58,000 kg. At launch it develops 120.000 kg/f, launching a 350 kg cargo into a 700 km SSO.
Teleglobal will deliver satellite-based broadband access via SES-12 to bridge the digital divide in far-flung locations across the 17,000-island archipelago.